Track Record

Projects

Selected projects delivered across bridges, industrial facilities and complex steel structures — evidence of execution capability, not a portfolio. The same single-point discipline now scaling to heavy industrial facilities.

All Projects

Filter by sector

23 selected projects — from 40+ delivered. The full reference list and capability dossier are available on request.
Steel frame of the machine tower during erection — January 2025Delivered
Industrial Facilities · 2025

Vertical Bright Annealing Line (VBAL) Building and Towers, Çorlu

TrinoxÇorlu, Tekirdağ, Türkiye11 months
1,093.21 t
Business center in İkitelli — front elevation as envelope works near completion, IstanbulDelivered
Commercial & Institutional · 2025

İkitelli Business Centre Shell and Core Works

MaskoIstanbul, Türkiye20 months
8,093 m² · 411.65 t
Anchorage chamber: galvanized stairs and walkways beneath the main cable strand fanDelivered
Bridge · 2023

1915 Çanakkale Bridge Anchor Block and Pier Access Structures

DLSY JVÇanakkale, Türkiye39 months
111.84 t
The Marmara Ereğlisi LNG Terminal jetty, pipe bridge and offshore platforms under construction
Industrial Facilities · 1994

Marmara Ereğlisi LNG Terminal: Jetty and Plant Structural Steelwork

GMK · group historyTekirdağ, Türkiye1992 – 1994
2,000 t
The Galata Bridge with its bascule leaf raised, seen from the Golden Horn
Bridge · 2001

Galata Bridge Bascule Leaf Repair

Nessac · group historyIstanbul, Türkiye24 months
Bosphorus Bridge tower leg wrapped in scaffolding during the stiffening works, IstanbulDelivered
Bridge · 2016

Bosphorus Bridge Tower Strengthening and Damper Installation

MakyolIstanbul, Türkiye29 months
412 t
Street elevation of the building converted into a health sciences faculty, Eyüp, IstanbulDelivered
Commercial & Institutional · 2015

Eyüp Health Sciences Faculty and Clinic Conversion

Bezmialem VakıfIstanbul, Türkiye8 months
13,652 m²
Completed pedestrian overpass on Kennedy Avenue — galvanised steel staircases and bridge railing, IstanbulDelivered
Infrastructure · 2016

Kennedy Avenue Pedestrian Overpasses: Concrete Works and Steel Stairs

Yapı MerkeziIstanbul, Türkiye8 months
134.41 t
The tower and steel deck of the Fatih Sultan Mehmet Bridge in Istanbul; the repair works were carried out inside this deck.Delivered
Bridge · 2017

Fatih Sultan Mehmet Bridge Orthotropic Deck Crack Repair

MakyolIstanbul, Türkiye11 months
The renewed expansion joint on the suspension bridge deck, open to traffic, with the tower behindDelivered
Bridge · 2017

Bosphorus Bridge Expansion Joint Replacement

MakyolIstanbul, Türkiye8 months
214.5 t
Multi-level steel strut system in the deep excavation of Rumeli Hisarüstü funicular station — strut pipes bearing on RC waler beams, IstanbulDelivered
Infrastructure · 2018

Rumeli Hisarüstü Funicular Station Steel Strut Shoring

Ankara İnşaatIstanbul, Türkiye5 months
Completed steel strut and waler system in the cut-and-cover excavation of the Kabataş–Mahmutbey Metro Line depot area, IstanbulDelivered
Infrastructure · 2018

Kabataş–Mahmutbey Metro Depot Strut and Waler Erection

Metrostav AnkaraIstanbul, Türkiye5 months
164.3 t
Courtyard of the completed school campus with its patterned entrance facadeDelivered
Commercial & Institutional · 2019

72-Classroom School Campus in Sancaktepe, Istanbul

TurkcellIstanbul, Türkiye8 months
19,005 m²
Delivered
Bridge · 2019

1915 Çanakkale Bridge Temporary Working Platform Assembly Support

Istanbul, Türkiye3 months
New widened walkway section lowered by crane into the tower-deck junction at night, aerial viewDelivered
Bridge · 2020

Bosphorus Bridge Tower-Deck Junction Repair

MakyolIstanbul, Türkiye5 months
Repair inside the orthotropic deck of the 15 July Martyrs (Bosphorus) Bridge: tightening bolts on splice plates at a rib-to-crossbeam joint, IstanbulDelivered
Bridge · 2020

Bosphorus Bridge Orthotropic Deck Crack Repair

MakyolIstanbul, Türkiye1 month
Completed galvanized steel track supports along the funicular line inside the stationDelivered
Infrastructure · 2021

Rumeli Hisarüstü–Aşiyan Funicular Line Steel Track Supports

Doppelmayr & GaraventaIstanbul, Türkiye7 months
33.68 t
A modular expansion joint guided by tag line during the crane liftDelivered
Bridge · 2022

1915 Çanakkale Bridge Expansion Joint Installation

MaurerÇanakkale, Türkiye3 months
Hanger connections along the Fatih Sultan Mehmet Bridge deck — additional gusset plate welded to the existing hanger plate, IstanbulDelivered
Bridge · 2022

Fatih Sultan Mehmet Bridge Gusset Plate Fabrication and Site Welding

IHIIstanbul, Türkiye9 months
Night-time removal and lift-off of a temporary welding platform at the tower topDelivered
Bridge · 2023

1915 Çanakkale Bridge Tower and Anchorage Temporary Works Removal

DLSY JVÇanakkale, Türkiye7 months
1,398.59 t
Completed tower top enclosures on the towers of the 1915 Çanakkale Bridge, aerial viewDelivered
Bridge · 2023

1915 Çanakkale Bridge Tower Top Enclosure Erection

DLSY JVÇanakkale, Türkiye5 months
Completed social facility and trade centre, aerial view from the parking side — İkitelli, IstanbulDelivered
Commercial & Institutional · 2025

İkitelli Social Facility and Trade Centre Completion Works

İOSBIstanbul, Türkiye9 months
19,814 m²
3D visualisation of the new maintenance gantry for the Fatih Sultan Mehmet BridgeOngoing
Bridge

Fatih Sultan Mehmet Bridge Maintenance Gantry Replacement

MakyolIstanbul, Türkiyeongoing

Have a complex steel project? Put the coordination risk on us.

One contract. Steel to finish. Tell us what you're building and we'll scope it under single-point responsibility.