Track Record
Projects
Selected projects delivered across bridges, industrial facilities and complex steel structures — evidence of execution capability, not a portfolio. The same single-point discipline now scaling to heavy industrial facilities.
All Projects
Filter by sector
13 selected projects — from 40+ delivered. The full reference list and capability dossier are available on request.
DeliveredBridge · 2023
1915 Çanakkale Bridge Anchor Block and Pier Access Structures
111.84 t

Bridge · 2001
Galata Bridge Bascule Leaf Repair
DeliveredBridge · 2016
Bosphorus Bridge Tower Strengthening and Damper Installation
412 t
DeliveredBridge · 2017
Fatih Sultan Mehmet Bridge Orthotropic Deck Crack Repair
DeliveredBridge · 2017
Bosphorus Bridge Expansion Joint Replacement
214.5 t
Delivered
Bridge · 2019
1915 Çanakkale Bridge Temporary Working Platform Assembly Support
DeliveredBridge · 2020
Bosphorus Bridge Tower-Deck Junction Repair
DeliveredBridge · 2020
Bosphorus Bridge Orthotropic Deck Crack Repair
DeliveredBridge · 2022
1915 Çanakkale Bridge Expansion Joint Installation
DeliveredBridge · 2022
Fatih Sultan Mehmet Bridge Gusset Plate Fabrication and Site Welding
DeliveredBridge · 2023
1915 Çanakkale Bridge Tower and Anchorage Temporary Works Removal
1,398.59 t
DeliveredBridge · 2023
1915 Çanakkale Bridge Tower Top Enclosure Erection
OngoingBridge
Fatih Sultan Mehmet Bridge Maintenance Gantry Replacement
Have a complex steel project? Put the coordination risk on us.
One contract. Steel to finish. Tell us what you're building and we'll scope it under single-point responsibility.