New widened walkway section lowered by crane into the tower-deck junction at night, aerial view
Projects
BridgeDelivered 2020

Bosphorus Bridge Tower-Deck Junction Repair

Nunteknik removed the plates and girders of the widened walkway sections around the towers at the four tower-deck junctions of the 15 July Martyrs Bridge (Bosphorus Bridge) in Istanbul and erected new steel fabricated to the measured dimensions of the old.

01 · The Brief

Plates and girders replaced at four tower-deck junctions

On the Bosphorus Bridge, the walkway widens around each tower where the tower meets the deck. These four widened walkway sections, on the north and south sides of the Ortaköy and Beylerbeyi towers, were to receive new plates and girders. As the subcontractor, we prepared the method statement, set up the access platform and winches, removed the old steel, and took on fabrication, erection, welding and painting of the new steel. Our scope also covered 73 repairs under the main deck.

02 · Technical Challenges

Access beneath the junction, matching existing steel

Reaching the old members meant working beneath the widened walkway section at elevation +58.00, from a platform assembled at the tower leg and pulled up by winch ropes passed through openings in the walkway. The new plates and girders would connect to the existing steel of the bridge, so their dimensions had to come from the removed piece itself. The work ran at four locations, two on each side of the Bosphorus, with the platform re-rigged at each, and dismantling and erection took place in night lane closures.

03 · Our Execution

A platform slung from the girders, steel made to measure

We assembled the platform from four pieces at the tower leg and lowered the winch ropes through openings in the walkway. We then raised the platform to +58.00 and hung it on wire-rope slings from lugs welded under the girders. After removing the hinged plates, we took out the main plate with its girders in one piece by mobile crane and sent it to our partner shop. The replacement was fabricated to its dimensions, blast-cleaned and painted. All welding on the main connection was done in the shop. We set the new piece in place whole, made the main connection with bolts, and completed the secondary site welds and touch-up painting.

04 · The Outcome

New steel at four junctions, final acceptance

All four widened walkway sections now have new plates and girders, and the 73 repairs under the main deck were completed. An independent inspection body checked the welds by magnetic particle testing; the five reports covering the four locations record them as accepted, some after repair. Provisional acceptance with the main contractor was granted in March 2020 and final acceptance in March 2021. Both certificates record nothing standing in the way of acceptance.

Execution & Assurance

The stages we delivered on this project

Select a stage to see how it was carried out and controlled.

1
EngineeringApproved method
2
FabricationShop fabrication
3
ErectionOwn crews first
4
TestingWeld inspection

Engineering

Engineering and method statements, approved before work starts.

Method statement approval

Project Documents — available on request

EN 1090EN ISO 9606NDT
Project Gallery

From the fabrication shop to the completed structure