Bridge & Infrastructure

Erection, rehabilitation and specialist systems on landmark spans — over water, under live traffic, against possession windows.

Four landmark crossings · erected without closing them

Bridge and infrastructure credentials

17
Bridge Projects
2 023 m
Longest Main Span
30+
Years on Bridges
Bridge clients and partners
DLSY JV
Makyol
Yapı Merkezi
Ankara İnşaat
Metrostav Ankara

What sets bridge work apart

EN 1090 · EXC3TPI · NDT

On top of the set every project carries — EN ISO 9606. QA/QC documentation and the full reference list on request.

Risk in This Sector

What goes wrong on bridges — and who absorbs it

Bridge steel is unforgiving: millimetre tolerances on thousand-metre spans, lifts over water and traffic, possession windows measured in hours. A generalist learns this on your structure — we already have, on four landmark crossings.

Risk & responsibility

Erection engineering and temporary works sit inside our scope — the coordination risk does not travel back to you.

Sector riskHow we absorb it
Possession windows measured in hoursLifts simulated in 4D and rehearsed before the road closes; the sequence is fixed, not improvised on site.
Lifts over water and live trafficIn-house erection engineering and temporary works design are part of our contract.
Weld integrity on fracture-critical membersApproved WPS, qualified welders, NDT and independent third-party sign-off, filed in the handover dossier.
Access at height for specialist systemsRope-access specialists we manage replace scaffold programmes — days instead of weeks, no lane closures.
Where We Fit

Bring us in for this — not for that

A good fit for

  • Landmark spans and long-span crossings
  • Rehabilitation and strengthening on operating bridges
  • Expansion joint, bearing and damper replacement
  • Erection under possession windows and live traffic

Not the right fit for

  • Concrete-only substructure packages
  • Road and pavement contracts with no steel scope
  • Single-visit inspection or survey assignments
Scope in This Sector

What we take responsibility for

Deck & steel erection

Heavy segment erection over water and live corridors — engineered lifts on 4D-simulated sequences.

Rehabilitation & strengthening

Structural repair on operating bridges, planned around traffic and possession windows.

Expansion joints & bearings

Supply and replacement of movement systems with certified partners such as Maurer.

Dampers & specialist systems

Damper, gantry and inspection systems installed at height, with rope-access specialists we manage.

Contract Structure

Bridge packages usually run on unit price

Quantities move as surveys land, so rates are fixed and measurement stays disciplined. Turnkey still applies where the scope is fully defined at tender.

Questions

Practical questions, direct answers

Traffic, height and weld verification — the questions bridge clients ask first.

Can you work under live traffic?

Yes — most of our bridge record was built without closing the crossing. Works are sequenced around agreed possession windows, typically at night.

How are critical welds verified?

Qualified welders work to approved welding procedures (WPS); critical welds carry NDT and independent third-party inspection (TPI) sign-off, documented in the handover dossier.

Do you supply joints, bearings and dampers?

We install and replace movement and damping systems with certified system partners such as Maurer and Doppelmayr — supply, logistics and installation under one contract.

Who engineers the erection?

Erection engineering is in-house: lift studies, temporary works and 4D sequence simulation are complete before the first segment moves.

Start a conversation

Have a bridge package coming up?

Send the drawings or a scope outline — we respond with an erection concept and a scoped, single-point proposal.