Steel to Finish

We self-perform the steel ourselves — erection, lifting, welding — under our own quality system, and coordinate the remaining trades under the same single-point contract.

Single point of accountability, from first drawing to handover

How a project moves through us

ENGINEER
shop drawings · statics
→
FABRICATE
certified partner shops
→
ERECT
own crews · managed subcontractors
→
TEST
NDT · third-party
→
HANDOVER
one dossier

"Engineer" is execution & method engineering — shop drawings, statics, sequencing — not conceptual design.

Notable exception

We have taken on design scope when a project required it — the FSM Gantry Crane package included design responsibility.

One named project, not a standing service.

Bridge references →

Governing every scope — self-performed and coordinated alike

Engineering & Quality Assurance

Even subcontracted trades run through our own ITP, WPS and third-party inspection system — nothing is handed off unchecked.

Execution Model

Two modes, one contract

We self-perform the steel; everything else runs through the same engineering and quality system, under one signature.

Mode 1 · Self-PerformedWith our own crews; managed subcontractors where the work calls for it

Structural Steel Erection & Dismantling

Fabrication-grade erection, welding, bolting and cutting — executed by our own crews and, where the work calls for it, by subcontractors we manage; inspected by us.

1915 Çanakkale BridgeBosphorus Bridge
View competencies →

Lifting & Heavy Handling

Crane, barge and tandem-lift operations engineered in-house, from rigging plan to execution.

1915 Çanakkale Bridge (DLSY)Production Facility, Kocaeli
View competencies →
Mode 2 · CoordinatedThrough our subcontractor network, under one contract
How the contract works
Coordination risk

Coordination risk stays with us, even on subcontracted trades.

Multi-Trade Coordination

Alongside the steel, we coordinate excavation and shoring, reinforced concrete, mechanical and electrical, insulation and roofing, and landscaping under one contract.

Production Facility, KocaeliCoordinated
View competencies →
Coordinated scopes carried on delivered projects:See the project record

Clients & partners across both modes

STFA
Makyol
IHI
Yapı Merkezi
Doppelmayr & Garaventa
Daelim
EXC3
Execution class, 1915 Çanakkale Bridge
Role & Responsibility

See where this fits your project

Tell us the scope — we'll show you exactly what we self-perform and what we coordinate, under one contract.