Industrial Facilities
Technically demanding production, logistics and shipyard facilities — steel structure to final handover under one contract.
Where facility builds fail — and who absorbs it
An industrial build fails in the interfaces: process equipment arriving mid-erection, utilities crossing structural packages, production that cannot stop. Single-point responsibility exists precisely for this coordination load — it stays with us, contractually.
Risk & responsibility
On a turnkey facility the interface load — OEM equipment, utilities, commissioning — is ours to carry. You hold one contract, not one per trade.
| Sector risk | How we absorb it |
|---|---|
| Process equipment arrives mid-erection | OEM interfaces are frozen during engineering and delivery slots are built into the erection programme. |
| Production cannot stop | Phased erection windows, protection and internal logistics agreed with plant management before mobilisation. |
| Utilities cross structural packages | One commissioning programme; mechanical and electrical interfaces are coordinated by us, not between your subcontractors. |
| Imported machinery and customs | Clearance and site interfaces sit inside our scope on turnkey contracts, or are priced as an item under other models. |
Bring us in for this — not for that
A good fit for
- Turnkey production, logistics and shipyard facilities
- Heavy structural steel with crane and handling systems
- Builds inside operating plants and shipyards
- Foreign investors who want a single contracting party in Türkiye
Not the right fit for
- Residential or mixed-use development
- Process engineering with no structural scope
- Equipment supply without construction works
What we take responsibility for
Turnkey facility delivery
The complete facility — structure, envelope, utilities and commissioning — under one lump-sum contract.
Structural steel packages
Heavy structural frames, mezzanines and platforms fabricated in EN 1090 certified shops.
Crane & handling systems
Crane runways, gantries and heavy handling systems integrated with the structural design.
Utilities & commissioning
Mechanical and electrical interfaces coordinated to a single commissioning programme.
Facilities are usually signed turnkey
One price and one responsible party is the point of a facility contract. Unit price fits when only the structural package is in scope.
Turnkey
Risk
Nunteknik carries it
Price
Fixed, lump sum
Best for
Defined scope
Unit Price
Risk
Shared
Price
Rate × measured quantity
Best for
Moving quantities
Cost-Plus
Risk
Client-weighted
Price
Cost + fixed fee
Best for
Early-phase scope
Practical questions, direct answers
Scope boundaries, operating plants and imported equipment — what facility investors ask first.
Can you build while our plant keeps operating?
Yes — works are phased around production, with erection windows, protection and logistics agreed with plant management before mobilisation.
Do you take the full facility or only the steel?
Either. Turnkey means the finished facility under one contract; alternatively we deliver the structural package within your delivery organisation.
How is imported process equipment handled?
Customs clearance and site interfaces for imported machinery sit within our scope on turnkey projects, and can be priced as an item under other models.
Who carries the interface risk with our equipment suppliers?
We do, on turnkey. OEM drawings, anchor layouts and delivery dates are coordinated by our engineering office, so a late machine does not become a claim between two of your contractors.
Planning a facility in Türkiye?
Tell us what you are building — we return a single-point delivery proposal, steel structure to final handover.