Turnkey Delivery
We deliver the finished facility. One price, one contract, one responsible party — coordination and interface risk stays with us, not on your balance sheet.
One contract. Full accountability.
Under a turnkey contract, Nunteknik takes single-point responsibility for the complete scope: engineering, procurement, fabrication, erection and commissioning. You sign one contract at a fixed lump-sum price and receive a finished, operational facility.
This is the right structure when scope is well defined and certainty matters more than flexibility — the schedule, the price and the interfaces are our problem, contractually.
At a Glance
- Price basis
- Fixed lump sum
- Scope certainty
- High — defined upfront
- Client involvement
- Low — milestone reviews
- Typical use
- Defined industrial facilities
Who carries it
Turnkey: coordination and interface risk stays with us — one contract, one responsible party.
How the contract behaves
Where the models truly differ: price formation, change handling and programme risk.
Fixed lump sum
A single price for the defined scope, fixed at contract signature. No remeasurement, no cost pass-through.
Formal variations
Scope changes run through a formal variation order — priced and agreed before execution. The base price stays protected.
Schedule is ours
Completion dates are contractual. Programme risk, recovery measures and acceleration sit with Nunteknik.
Where turnkey fits — and where it does not
A good fit for
- Industrial facilities with a well-defined scope
- Investors who want one contract and single-point responsibility
- Projects where schedule certainty is critical
- Foreign investors without a local delivery organisation
Not the right fit for
- Early-phase projects where scope is still forming
- Projects where the client keeps design in-house
- Work packages that will be remeasured as they evolve
Not sure turnkey fits your project?
Share the outline of your project — we tell you which contract model fits, before any pricing work starts.
From enquiry to handover
Fixed steps from enquiry to a finished facility — scope freeze up front, single-point delivery after.
Financial Reliability
Advance Payment Guarantee
Bank-backed guarantee against every advance received.
Performance Bond
Completion secured by bond for the contract value.
Warranty & Retention
Defect liability period with retention released on handover.
Instrument terms follow the contract — documents available on request.
Need a different model?
Each model answers a different project situation. Price, change and programme mechanics are detailed on each model's page.
Turnkey
Choose when
Scope is defined and price certainty matters most
Unit Price
Choose when
Quantities will move but rates must stay fixed
Cost-Plus
Choose when
Scope is still forming and speed matters most
Practical questions, direct answers
Tax, customs and site practicalities that sit outside the contract model itself.
How is VAT handled for foreign investors?
VAT treatment depends on your investment incentive certificate and the contract structure. We set the invoicing structure up with your tax advisor before signature — not after the first invoice.
Are there local-content requirements?
Incentivised investments can carry local-content expectations. We advise on which packages are economically sourced in Türkiye and which are worth importing.
How is site labour regulated?
All site labour runs under Turkish labour law and our HSE system regardless of contract model — SGK registration, certified trades and documented safety training.
Scope your turnkey delivery
Send the outline of your facility — we respond with a scoped, single-point delivery proposal.