Engineering Library
Notes, guides, downloadable technical documents and case studies from the projects we ran: erection sequences, weld files, tolerances and the decisions that moved a programme.
Index
Notes are written by the engineers who ran the work: what was decided, what it cost in time, and what we would do differently.
Browse by topic: all tags →Bridge & Infrastructure
2 notes
What a Method Statement Reviewer Asks — and How to Answer First
A method statement is rarely sent back for what it says; it is sent back for what it leaves out. Review forms from two bridge jobs show the same gaps: lifting points not checked on site, a sequence not tied to access, no fallback for a seized bolt, and no landing place for each piece.
Dismantling Structural Steel Is Not Erection in Reverse
Dismantling is not erection in reverse. Every piece removed leaves the structure in a state it was not designed for, so the sequence is planned separately and written down first. The crane sizes the pieces, seized connections are cut, the structure around the works often stays in use, and reused steel comes out only when the next area is ready.
Industrial Facilities
No notes published in this sector yet.
A note did not answer it?
Technical enquiries reach the engineering team directly. Send your drawings or describe the constraint — we answer with the same detail we write in.