Steel Fabrication
We prepare shop drawings, manage fabrication in certified partner shops and see the coating through, so the steel reaches site detailed, protected and recorded.
Competencies in this capability
Each competency below is delivered under the same contract and the same quality system.

Fabrication Management
We prepare shop drawings, supply material and manage fabrication and shop welding in EN 1090 certified partner shops, from cutting plans to delivery to site.

Protective Coating
Blast cleaning and painting in partner shops, hot-dip galvanising at outside galvanisers, and site painting by our own painters, including the coating of repair and strengthening plates.
Where we applied it
Selected projects: shop drawings and managed fabrication
| Project | Applied as | Standard | Scale |
|---|---|---|---|
| Çorlu Steel Building and Machine Towers | Shop drawings, managed fabrication | EXC3 | around 1,093 t |
| Bosphorus Bridge Tower Strengthening | Fabrication management | around 412 t | |
| İkitelli Business Center Shell and Core | Shop drawings, material, managed fabrication | around 412 t | |
| 1915 Çanakkale Bridge Access Structures | Drawings, managed fabrication | EXC2 | around 113 t |
| Fatih Sultan Mehmet Bridge Gusset Plates | Shop drawings, managed fabrication, shop and site painting |
On these projects
- Galvanising above TS EN ISO 1461 minimum in measured batch
- Each plate traceable from heat number to inspection report
Inspection documents
- Inspection and test plan (ITP)◷ pending
- Paint thickness inspection reports◷ pending
Published as cover, contents and redacted signature pages. Full ITPs, method statements and shop drawings are not published.
From site survey to protected steel
Four steps we follow when new steel has to fit a design and an existing structure.
Frequently asked questions
Do you have your own fabrication shop?
No. Fabrication runs in EN 1090 certified partner shops under our responsibility. We prepare the shop drawings, supply material where the contract requires it, and manage fabrication, blast cleaning, painting, hot-dip galvanising and delivery to site.
Who does the painting and galvanising?
Shop painting is done in partner shops and hot-dip galvanising at outside galvanisers, both under our control. On site our own painters coat the steel we supply where the job needs it, not only touch-up: repair and strengthening plates included.
Which welding standards have you worked to?
Repair and joint welding on Bosphorus Bridge jobs followed AASHTO/AWS D1.5. The 1915 Çanakkale Bridge access structures were fabricated in a partner shop to EN 1090-2; the expansion joints on the same bridge were welded to our own WPS.
Let's Discuss Your Steel Package
Send us the drawings and the coating specification. We will set out how we would detail, fabricate and protect the steel on your project.