Steel Erection & Dismantling

We erect new steel, make its site connections and take down the steel that has done its job, with the same crews, lift plans and records, often with the structure still in service.

Short answer
Nunteknik erects and dismantles structural steel on bridges, industrial plants and buildings. We erect with our crews and the subcontractors we manage, make the welded and bolted connections on site, and remove temporary works and existing steel piece by piece, split to suit the crane. We write the method statements and lift plans ourselves, and often work on structures that stay in service: bridges under live traffic, plants in production.
Nunteknik · İstanbul, Türkiye
Scope

Competencies in this capability

Each competency below is delivered under the same contract and the same quality system.

Steel Erection

Steel Erection

Our crews and the subcontractors we manage erect steel in tower legs, excavations, plant buildings and bridge decks, in step with excavation, lane closures or production.

Steel Dismantling

Steel Dismantling

Tower-top bents and winches, bridge joints and plates, excavation struts and plant roof trusses, split to crane capacity, lowered in sequence, removed or re-erected as planned.

Welded Connections

Welded Connections

Site welding to approved procedures, from full-penetration repair welds with preheat to 35–50 mm S460M joints, with arc gouging and plasma cutting for removal.

Bolted Connections

Bolted Connections

Bolted splices, strengthening plates and modules, with holes drilled in place where needed, bolts tightened by turn-of-nut or torque and bolt tools checked by calibration.

Track record

Where we applied it

Selected projects: steel erection, site connections and dismantling

ProjectApplied asStandardScale
1915 Çanakkale Bridge Temporary Works RemovalMethod, lift plans and dismantling at tower topsaround 1,400 t
Bosphorus Bridge Expansion Joint ReplacementRemoval, bolted and welded erection under trafficAASHTO/AWS D1.5around 215 t
Bosphorus Bridge Tower-Deck Junction RepairPlate and girder removal at tower-deck junctionsAASHTO/AWS D1.54 junctions
1915 Çanakkale Bridge Expansion JointsPositioning, welding and bolt torquing4 × 55 t
Fatih Sultan Mehmet Bridge Gusset PlatesFull-penetration site welds on existing hanger plates
Çorlu Steel Building and Machine TowersErection, truss and crane rail removal in an operating plantEXC3around 1,093 t
Bosphorus Bridge Tower StrengtheningBolted erection in towersaround 412 t
İkitelli Business Center Shell and CoreBolted erectionaround 412 t
1915 Çanakkale Bridge Access StructuresErectionEXC2around 113 t
Kabataş–Mahmutbey Metro Depot Steel ShoringRemoval and re-erection of walers and struts42 walers, 29 struts

On these projects

  • Final acceptance on three bridge jobs, no obstacle recorded
  • MT accepted every location examined on two bridge jobs
  • Fit-up, weld log, NDT and torque report for each joint
  • Taking-over certificate issued with no outstanding items
  • Same steel removed and re-erected for a second stage

Inspection documents

  • Method statements and lift plans◷ pending
  • Weld log, fit-up and bolt-torque reports◷ pending
  • Magnetic particle testing reports◷ pending
  • Dismantling scaffold structural analysis report◷ pending

Published as cover, contents and redacted signature pages. Full ITPs, method statements and shop drawings are not published.

How we apply it

From lift plan to recorded joint

Four steps we follow when steel goes up or comes down on a site that stays in use.

PlanWe prepare the method statement and lift plans, set the sequence, lifting points and sling angles, and tie the work to excavation, lane closures or production.
Erect or removeNew steel is lifted by mobile or tower crane; old steel is split to crane capacity, its bolts released by torque wrench or cut by oxy-fuel, carbon arc or plasma.
Connect and recordWelds go through NDT, bolts are torqued and checked, and each joint is recorded against the quality plan.
RestoreCut connections get grout, epoxy and paint repairs, or new steel goes in; the works are inspected before handover.

Standards

AASHTO/AWS D1.5Bridge welding code on Bosphorus jobs

Certificate numbers are available on request.

FAQ

Frequently asked questions

Who carries out the erection?

Our crews and the subcontractors we manage. Where erection is in our scope, we plan the sequence, lifts and access and record the work; on the Bosphorus Bridge towers, every stiffener was recorded on an inspection form.

Can you work on a structure that stays in service?

Yes. On the Bosphorus Bridge we replaced the expansion joints in four phases with two of six lanes closed at a time, and removed the plates of the widened walkway sections during night lane closures. In Çorlu we strengthened the plant building and removed roof trusses and crane rails while production continued.

Who prepares the dismantling method and lift plans?

We do. On the 1915 Çanakkale Bridge we prepared method statements and lift plans for every structure, setting the sequence, lifting points and sling angles, and did the structural calculations for the dismantling scaffolds ourselves.

How do you remove heavy items at height?

We split them into pieces the crane can lift. On the 1915 Çanakkale Bridge each 21-tonne tower-top winch came down in three parts and the main-span catwalk anchoring beams in ten. Rope access technicians removed the hard-to-reach connection plates.

What records do you keep for site connections?

They follow the quality plan. On the 1915 Çanakkale Bridge expansion joints we issued a fit-up report, a weld log, NDT reports and a bolt-torque report for each joint, kept against the inspection points of the quality plan.

Can removed steel be used again?

Yes, where the scope calls for it. At the Kabataş–Mahmutbey Metro depot the first-stage walers and struts were removed and re-erected in the second work area; in Çorlu the crane rails were re-erected at the +42.00 m level.

Next Step

Let's Plan Your Erection or Dismantling

Send us the drawings and the site constraints. We will set out how we would erect, connect or remove the steel on your project.