Steel Erection & Dismantling
We erect new steel, make its site connections and take down the steel that has done its job, with the same crews, lift plans and records, often with the structure still in service.
Competencies in this capability
Each competency below is delivered under the same contract and the same quality system.

Steel Erection
Our crews and the subcontractors we manage erect steel in tower legs, excavations, plant buildings and bridge decks, in step with excavation, lane closures or production.

Steel Dismantling
Tower-top bents and winches, bridge joints and plates, excavation struts and plant roof trusses, split to crane capacity, lowered in sequence, removed or re-erected as planned.

Welded Connections
Site welding to approved procedures, from full-penetration repair welds with preheat to 35–50 mm S460M joints, with arc gouging and plasma cutting for removal.

Bolted Connections
Bolted splices, strengthening plates and modules, with holes drilled in place where needed, bolts tightened by turn-of-nut or torque and bolt tools checked by calibration.
Where we applied it
Selected projects: steel erection, site connections and dismantling
| Project | Applied as | Standard | Scale |
|---|---|---|---|
| 1915 Çanakkale Bridge Temporary Works Removal | Method, lift plans and dismantling at tower tops | around 1,400 t | |
| Bosphorus Bridge Expansion Joint Replacement | Removal, bolted and welded erection under traffic | AASHTO/AWS D1.5 | around 215 t |
| Bosphorus Bridge Tower-Deck Junction Repair | Plate and girder removal at tower-deck junctions | AASHTO/AWS D1.5 | 4 junctions |
| 1915 Çanakkale Bridge Expansion Joints | Positioning, welding and bolt torquing | 4 × 55 t | |
| Fatih Sultan Mehmet Bridge Gusset Plates | Full-penetration site welds on existing hanger plates | ||
| Çorlu Steel Building and Machine Towers | Erection, truss and crane rail removal in an operating plant | EXC3 | around 1,093 t |
| Bosphorus Bridge Tower Strengthening | Bolted erection in towers | around 412 t | |
| İkitelli Business Center Shell and Core | Bolted erection | around 412 t | |
| 1915 Çanakkale Bridge Access Structures | Erection | EXC2 | around 113 t |
| Kabataş–Mahmutbey Metro Depot Steel Shoring | Removal and re-erection of walers and struts | 42 walers, 29 struts |
On these projects
- Final acceptance on three bridge jobs, no obstacle recorded
- MT accepted every location examined on two bridge jobs
- Fit-up, weld log, NDT and torque report for each joint
- Taking-over certificate issued with no outstanding items
- Same steel removed and re-erected for a second stage
Inspection documents
- Method statements and lift plans◷ pending
- Weld log, fit-up and bolt-torque reports◷ pending
- Magnetic particle testing reports◷ pending
- Dismantling scaffold structural analysis report◷ pending
Published as cover, contents and redacted signature pages. Full ITPs, method statements and shop drawings are not published.
From lift plan to recorded joint
Four steps we follow when steel goes up or comes down on a site that stays in use.
Frequently asked questions
Who carries out the erection?
Our crews and the subcontractors we manage. Where erection is in our scope, we plan the sequence, lifts and access and record the work; on the Bosphorus Bridge towers, every stiffener was recorded on an inspection form.
Can you work on a structure that stays in service?
Yes. On the Bosphorus Bridge we replaced the expansion joints in four phases with two of six lanes closed at a time, and removed the plates of the widened walkway sections during night lane closures. In Çorlu we strengthened the plant building and removed roof trusses and crane rails while production continued.
Who prepares the dismantling method and lift plans?
We do. On the 1915 Çanakkale Bridge we prepared method statements and lift plans for every structure, setting the sequence, lifting points and sling angles, and did the structural calculations for the dismantling scaffolds ourselves.
How do you remove heavy items at height?
We split them into pieces the crane can lift. On the 1915 Çanakkale Bridge each 21-tonne tower-top winch came down in three parts and the main-span catwalk anchoring beams in ten. Rope access technicians removed the hard-to-reach connection plates.
What records do you keep for site connections?
They follow the quality plan. On the 1915 Çanakkale Bridge expansion joints we issued a fit-up report, a weld log, NDT reports and a bolt-torque report for each joint, kept against the inspection points of the quality plan.
Can removed steel be used again?
Yes, where the scope calls for it. At the Kabataş–Mahmutbey Metro depot the first-stage walers and struts were removed and re-erected in the second work area; in Çorlu the crane rails were re-erected at the +42.00 m level.
Let's Plan Your Erection or Dismantling
Send us the drawings and the site constraints. We will set out how we would erect, connect or remove the steel on your project.