About Us

One contract.
Steel to finish.

For more than 30 years we have taken single-point responsibility for complex steel and infrastructure projects, as an engineering firm run on family values.

One Contract

We manage the outcome, not the subcontractors.

One contract, one responsibility. On a complex steel or industrial facility project, we carry the coordination risk, not you.

Common model

Multi-contractor model

Investor
SteelStructural designErectionTesting / NDT

Four contracts, four interfaces: the coordination risk stays with you.

Nunteknik

Single-contract model

InvestorNUNTEKNIK
SteelStructural designErectionTesting / NDT

One contract, one responsibility: the coordination risk stays with us.

How We Work

Single-point delivery in five steps.

From engineering to handover, the whole chain is in one hand. Interface risks move from you to us.

1
EngineeringShop drawings, connection design and method statements, approved before fabrication starts.
2
FabricationFabrication in EN 1090 certified partner shops, under our quality control and approved WPS, with full material traceability.
3
ErectionErection by our own crews and, where the work calls for it, by subcontractors we manage; rigging and heavy lifts on site.
4
TestingNDT on critical welds, with independent third-party inspection (TPI) where the contract calls for it.
5
HandoverCommissioning and the as-built file, handed over under one contract.
Group history

Started on a plant, proven on bridges.

The group’s steel work began in 1992 on an LNG terminal and has deepened on bridges since 1999. Today we bring that record to delivering complex facilities from a single point of responsibility.

1992

Group history: GMK

GMK, founded by Musa Kahya, built the jetty and plant steelwork of the Marmara Ereğlisi LNG terminal as its first job (1992–1994).

1999–2023

Bridge expertise

Galata*, Bosphorus, FSM and 1915 Çanakkale bridges: expansion joints and heavy lifting.

Today

Complex facility delivery

Single-point delivery of industrial facilities.

* The Galata Bridge repair (1999–2001) was carried out by Nessac, part of our group history.

Sectors
Management Team

Leadership proven on site.

We introduce the team by the work each of them has carried on site.

Musa Kahya

Musa Kahya

Founder and General ManagerProject manager of the Galata Bridge bascule leaf repairs (1999–2001)MSc Mechanical Engineering · Istanbul Technical University · 1983
Muhammed Kahya

Muhammed Kahya

Deputy General ManagerOn bridge projects since 2014BSc Civil Engineering · Sakarya University · 2010
Nazım Çakmakcı

Nazım Çakmakcı

Head of Steel Works40+ years in mechanical and welding work · Galata BridgeDipl.-Ing. Mechanical Engineering · Fachhochschule Hamburg · 1986 · Welding Engineer (DVS, 1987)
Betül Şahin

Betül Şahin

Finance and Administration Manager25+ years in sales and purchasingBSc Geodesy and Photogrammetry Engineering · Istanbul Technical University · 1986

Let's manage the risk together.

Review our reference projects and technical file for your next project.