Lifting & Access
We plan each lift, match crane and rigging to the piece, and set up access where the work is high or out of reach, so heavy steel reaches its position on your project to a written plan.
Competencies in this capability
Each competency below is delivered under the same contract and the same quality system.

Heavy Crane Lifting
Mobile, tower and tower-top crane lifts, from 55-tonne expansion joints to 21-tonne winches lowered in parts from a bridge tower top.

Barge Lifting
Barge loading plans, prepared within the method statement for removing the temporary works of the 1915 Çanakkale Bridge.

Tandem Lifting
Two-crane lifts of pre-assembled units: landing platforms for the 1915 Çanakkale Bridge were assembled on the ground and lifted with two cranes on the deck.

Lift Planning
Lift plans and method statements that set the sequence, lifting points and sling angles for each piece, with crane selection and rigging matched to its weight.

Rope Access & Work at Height
Work inside bridge tower legs, from a platform hung below the deck at +58.00, and by rope access where connection points can only be reached at height.
Where we applied it
Selected projects: crane lifts, lift planning, rope access, work at height
| Project | Applied as | Standard | Scale |
|---|---|---|---|
| 1915 Çanakkale Bridge Temporary Works Removal | Lift plans, tower-top lowering, rope access | around 1,400 t | |
| 1915 Çanakkale Bridge Expansion Joints | Lift plan and 350 t crane lift of each joint | 4 × 55 t | |
| 1915 Çanakkale Bridge Access Structures | Two-crane lift, connections by rope access | EXC2 | around 113 t |
| Bosphorus Bridge Tower Strengthening | Cranes and scaffolds inside tower legs, to +149 m | around 412 t | |
| Bosphorus Bridge Tower-Deck Junction Repair | Platform hung at +58.00, one-piece crane lifts | 4 junctions | |
| Çorlu Steel Building and Machine Towers | Tower crane erection, rails re-erected at +42.00 m | EXC3 | around 1,093 t |
On these projects
- Temporary works taken over with no outstanding items
- Provisional acceptance for the bridge access structures
- All four 55 t joints installed, every contract item done
- Final acceptance on the four tower-deck junctions
Inspection documents
- Method statement and lift plans◷ pending
- Rope access method statement◷ pending
- Tower crane foundation calculation report◷ pending
Published as cover, contents and redacted signature pages. Full ITPs, method statements and shop drawings are not published.
From lift plan to piece in position
Three steps we follow when a piece is heavy, high or hard to reach.
Plan
We set the sequence, lifting points and sling angles, and split each piece to what the crane can lift.
Set up access
We build platforms and scaffolds, calculate them where needed, and use rope access where nothing else reaches.
Lift and hand over
We lift in the planned order, stop when wind rules out lifting, and hand each work front over for inspection.
Frequently asked questions
Who prepares the lift plan?
We do. On the 1915 Çanakkale Bridge expansion joints the client provided the crane; the lift plan and the operation were ours. For the temporary works on the same bridge we prepared method statements and lift plans setting the sequence, lifting points and sling angles.
Can you lift where crane capacity is limited?
Yes. We split each piece to what the crane can lift. On the 1915 Çanakkale Bridge tower tops, 21-tonne winches were lowered in three parts after separating the motor and traverse, and the main-span catwalk anchoring beams in ten.
When do you use rope access?
Where connection points can only be reached at height. On the 1915 Çanakkale Bridge, landing platforms lifted with two cranes were connected beneath the deck by rope access, clipped to anchor points. Rope access technicians also removed hard-to-reach plates on the tower tops.
Can you work at height inside an existing structure?
Yes. On the Bosphorus Bridge we set up scaffolds and cranes inside the tower legs to fit stiffening at levels up to +149 m. On the same bridge, ground winches raised a platform hung from the tower leg to +58.00 to reach the tower-deck junctions.
Let's Discuss Your Lift
Send us the weights, the site and the access constraints. We will set out how we would plan the lifts and reach the work on your project.