Capability · Lifting and Work at Height

Lifting & Access

We plan each lift, match crane and rigging to the piece, and set up access where the work is high or out of reach, so heavy steel reaches its position on your project to a written plan.

Short answer
Nunteknik plans and carries out heavy lifts and work at height on bridges and industrial plants. We prepare lift plans and method statements that set the sequence, lifting points and sling angles, and split each piece to what the crane can lift. We lift by mobile, tower and tower-top crane, and where connection points can only be reached at height, we work from hung platforms or by rope access.
Nunteknik · İstanbul, Türkiye
Scope

Competencies in this capability

Each competency below is delivered under the same contract and the same quality system.

Heavy Crane Lifting

Heavy Crane Lifting

Mobile, tower and tower-top crane lifts, from 55-tonne expansion joints to 21-tonne winches lowered in parts from a bridge tower top.

Barge Lifting

Barge Lifting

Barge loading plans, prepared within the method statement for removing the temporary works of the 1915 Çanakkale Bridge.

Tandem Lifting

Tandem Lifting

Two-crane lifts of pre-assembled units: landing platforms for the 1915 Çanakkale Bridge were assembled on the ground and lifted with two cranes on the deck.

Lift Planning

Lift Planning

Lift plans and method statements that set the sequence, lifting points and sling angles for each piece, with crane selection and rigging matched to its weight.

Rope Access & Work at Height

Rope Access & Work at Height

Work inside bridge tower legs, from a platform hung below the deck at +58.00, and by rope access where connection points can only be reached at height.

Track record

Where we applied it

Selected projects: crane lifts, lift planning, rope access, work at height

ProjectApplied asStandardScale
1915 Çanakkale Bridge Temporary Works RemovalLift plans, tower-top lowering, rope accessaround 1,400 t
1915 Çanakkale Bridge Expansion JointsLift plan and 350 t crane lift of each joint4 × 55 t
1915 Çanakkale Bridge Access StructuresTwo-crane lift, connections by rope accessEXC2around 113 t
Bosphorus Bridge Tower StrengtheningCranes and scaffolds inside tower legs, to +149 maround 412 t
Bosphorus Bridge Tower-Deck Junction RepairPlatform hung at +58.00, one-piece crane lifts4 junctions
Çorlu Steel Building and Machine TowersTower crane erection, rails re-erected at +42.00 mEXC3around 1,093 t

On these projects

  • Temporary works taken over with no outstanding items
  • Provisional acceptance for the bridge access structures
  • All four 55 t joints installed, every contract item done
  • Final acceptance on the four tower-deck junctions

Inspection documents

  • Method statement and lift plans◷ pending
  • Rope access method statement◷ pending
  • Tower crane foundation calculation report◷ pending

Published as cover, contents and redacted signature pages. Full ITPs, method statements and shop drawings are not published.

How we apply it

From lift plan to piece in position

Three steps we follow when a piece is heavy, high or hard to reach.

  1. Plan

    We set the sequence, lifting points and sling angles, and split each piece to what the crane can lift.

  2. Set up access

    We build platforms and scaffolds, calculate them where needed, and use rope access where nothing else reaches.

  3. Lift and hand over

    We lift in the planned order, stop when wind rules out lifting, and hand each work front over for inspection.

FAQ

Frequently asked questions

Who prepares the lift plan?

We do. On the 1915 Çanakkale Bridge expansion joints the client provided the crane; the lift plan and the operation were ours. For the temporary works on the same bridge we prepared method statements and lift plans setting the sequence, lifting points and sling angles.

Can you lift where crane capacity is limited?

Yes. We split each piece to what the crane can lift. On the 1915 Çanakkale Bridge tower tops, 21-tonne winches were lowered in three parts after separating the motor and traverse, and the main-span catwalk anchoring beams in ten.

When do you use rope access?

Where connection points can only be reached at height. On the 1915 Çanakkale Bridge, landing platforms lifted with two cranes were connected beneath the deck by rope access, clipped to anchor points. Rope access technicians also removed hard-to-reach plates on the tower tops.

Can you work at height inside an existing structure?

Yes. On the Bosphorus Bridge we set up scaffolds and cranes inside the tower legs to fit stiffening at levels up to +149 m. On the same bridge, ground winches raised a platform hung from the tower leg to +58.00 to reach the tower-deck junctions.

Next Step

Let's Discuss Your Lift

Send us the weights, the site and the access constraints. We will set out how we would plan the lifts and reach the work on your project.