Cost-Plus Delivery
Actual cost plus a fixed fee, fully open book. Maximum transparency and speed for scopes that are still taking shape.
Open book. Fixed fee.
Under a cost-plus contract, you pay the documented actual cost of the works plus a pre-agreed fee. Every invoice, subcontract and payroll line is open book — you see what the project costs because you see the books.
This is the fastest way to start when scope is still forming: work begins while design matures, and the client keeps full commercial visibility and control throughout.
At a Glance
- Price basis
- Actual cost + fixed fee
- Scope certainty
- Low — evolves in flight
- Client involvement
- High — open-book review
- Typical use
- Early-phase, fast-track works
Who carries it
Cost-plus: cost risk sits with the client; our fee is fixed — transparency is the control mechanism.
How the contract behaves
Where the models truly differ: price formation, change handling and programme risk.
Documented cost + fee
Actual, auditable cost plus a fixed fee agreed upfront. No hidden margins — the fee is the only margin.
Continuous, frictionless
Scope evolves without variation machinery — changes flow directly into the open-book cost with client approval.
Fastest possible start
Work starts while design matures. The programme is managed jointly, and cost visibility is the control for both speed and spend.
Where cost-plus fits — and where it does not
A good fit for
- Early-phase projects where design is still maturing
- Fast-track works that cannot wait for full scope
- Clients who want full open-book cost visibility
- Complex retrofits where surprises are expected
Not the right fit for
- Investors who need price certainty at signature
- Clients without capacity to review open-book costs
- Well-defined scopes better served by turnkey
Not sure cost-plus fits your project?
Share the outline of your project — we tell you which contract model fits, before any pricing work starts.
From enquiry to handover
Start fast, steer together — open-book cost control from the first invoice to the final account.
Delivered cost-plus
Financial Reliability
Advance Payment Guarantee
Bank-backed guarantee against every advance received.
Performance Bond
Completion secured by bond for the contract value.
Warranty & Retention
Defect liability period with retention released on handover.
Instrument terms follow the contract — documents available on request.
Need a different model?
Each model answers a different project situation. Price, change and programme mechanics are detailed on each model's page.
Turnkey
Choose when
Scope is defined and price certainty matters most
Unit Price
Choose when
Quantities will move but rates must stay fixed
Cost-Plus
Choose when
Scope is still forming and speed matters most
Practical questions, direct answers
Tax, customs and site practicalities that sit outside the contract model itself.
How is VAT handled for foreign investors?
VAT treatment depends on your investment incentive certificate and the contract structure. We set the invoicing structure up with your tax advisor before signature — not after the first invoice.
Are there local-content requirements?
Incentivised investments can carry local-content expectations. We advise on which packages are economically sourced in Türkiye and which are worth importing.
How is site labour regulated?
All site labour runs under Turkish labour law and our HSE system regardless of contract model — SGK registration, certified trades and documented safety training.
Start open book, start now
Tell us where the project stands — we propose a fee structure and an early-works plan.