Multi-Trade Coordination
We manage the trades around and beyond the steel frame under one contract, so your project has one party answerable for coordination, approvals and handover.
Competencies in this capability
Each competency below is delivered under the same contract and the same quality system.

Multi-Trade Coordination
Alongside the steel, we coordinate excavation and shoring, reinforced concrete, mechanical and electrical, insulation and roofing, façades, interior finishes and landscaping under one contract.
Where we applied it
Selected projects: main contracting across trades under one contract
| Project | Applied as | Standard | Scale |
|---|---|---|---|
| 72-Classroom School Campus in Sancaktepe | Turn-key main contractor, excavation to landscaping | 19,004 m² | |
| İkitelli Business Center Shell and Core | Main contractor, shoring to façade | 8,093 m² | |
| İkitelli Trade Centre Completion Works | Management and coordination, shell to handover | 19,814 m² | |
| Eyüp Health Sciences Faculty Building Conversion | Management and coordination of 47 work packages | approx. 13,652 m² |
On these projects
- Provisional acceptance recorded on all four projects
- No defects preventing acceptance, on three projects
- Punch lists closed out after provisional acceptance
- Four added packages kept within the same contract
Inspection documents
- Provisional acceptance certificates◷ pending
- As-built drawings and building operation handbook◷ pending
- Client-approved quotations for 47 work packages◷ pending
Published as cover, contents and redacted signature pages. Full ITPs, method statements and shop drawings are not published.
From scope to handover
Three steps we follow when several trades share one building and one contract.
Survey and scope
We survey the building with the client, revise the design where it does not fit and fix the scope.
Package and approve
We split the works into packages, compare quotations and put each package to the client for approval.
Run and hand over
We run the trades in parallel, test and commission services and hand over as-built drawings.
Frequently asked questions
Do you take on work beyond the steel frame?
Yes. As main contractor we have carried the full structure and envelope of a building under one contract: on a business center in İkitelli, from excavation and bored-pile shoring through the reinforced-concrete basement and steel frame to the roof and façade.
Who carries out the trade works?
Our crews and the subcontractors we manage. On the Eyüp faculty building we split the works into 47 packages approved by the client; coordination between subcontractors, shop drawings and the testing and commissioning of electrical and mechanical systems were ours.
What happens if an approved subcontractor withdraws?
We replace them through the same approval route. On the Eyüp faculty building, when the approved heavy steel subcontractor withdrew, we submitted the next quotation the same day and the client approved it.
Can you take over a building another contractor started?
Yes. In İkitelli we took over a 19,814 m² trade centre at shell stage. A joint survey with the client's inspection unit showed the roof steel needed strengthening; we revised the design, and the works reached provisional acceptance in February 2025.
Can the scope grow during the job?
Yes, within the same contract. On the İkitelli business center the client added foundation-level services, roof parapets and gutters, internal walls and the façade while work was under way; for the façade we also produced the shop drawings.
Let's Discuss Your Project Scope
Send us the scope and the drawings. We will set out how we would split the works into packages and coordinate them on your project.