We write the inspection and test plan, qualify welding procedures and welders, and record welds, bolts and coatings against it, so your project's quality is on record.

Short answer
Nunteknik plans, tests and records the quality of steelwork on bridges and industrial plants. We prepare the inspection and test plan, weld to procedures qualified in our name, and have welds examined by visual, magnetic particle and ultrasonic testing. Inspection requests go to the consultant, and connections are recorded against the plan, including the work of subcontractors we manage.
Nunteknik · İstanbul, Türkiye
Scope

Competencies in this capability

Each competency below is delivered under the same contract and the same quality system.

Quality Plan & ITP

Quality Plan & ITP

We prepare the ITP with the method statement and set its inspection points. Material certificates, material lists and coating test reports are checked against it.

Welding Procedure Qualification

Welding Procedure Qualification

Welding procedures and welder qualifications in our name, from AASHTO/AWS D1.5 repair procedures with preheat to processes 136 and 121 on 35–50 mm S460M joints.

Third-Party Inspection

Third-Party Inspection

Inspection requests go to the consultant before NDT, bolt checks and painting, and MT is carried out by third-party bodies. WIR and MRIR requests track each check to closure.

Non-Destructive Testing

Non-Destructive Testing

Visual and dimensional weld checks, then MT and UT, with dye-penetrant testing to locate crack tips. On deck repairs, NDT comes at least 24 hours after welding.

Track record

Where we applied it

Selected projects: inspection plans, welding procedures and testing

ProjectApplied asStandardScale
1915 Çanakkale Bridge Expansion JointsITP, own WPS, VT, MT and UT, records per joint4 joints
Çorlu Steel Building and Machine TowersITP prepared; weld and paint reports acceptedEXC3around 1,093 t
Fatih Sultan Mehmet Bridge Fatigue Crack RepairWelder tests, dye-penetrant testing, NDTAASHTO/AWS D1.51,576 repairs
Bosphorus Bridge Tower-Deck Junction RepairWPS, third-party MT, inspection requestsAASHTO/AWS D1.54 junctions
Bosphorus Bridge Orthotropic Deck Crack RepairThird-party MT, inspection requests59 repairs
1915 Çanakkale Bridge Temporary Works RemovalITP prepared, qualified welders8 qualified welders

On these projects

  • MT accepted every location examined on two bridge jobs
  • Weld and paint test reports reviewed and found acceptable
  • Fit-up, weld log, NDT and torque report for each joint
  • Galvanising above TS EN ISO 1461 minimum in measured batch

Inspection documents

  • Inspection and test plan (ITP)◷ pending
  • Welding procedure specifications (WPS)◷ pending
  • Magnetic particle testing reports◷ pending

Published as cover, contents and redacted signature pages. Full ITPs, method statements and shop drawings are not published.

How we apply it

From inspection plan to closed record

Five steps we follow so that the welds, bolts and coatings on your project are planned, tested and recorded.

PlanWe prepare the ITP and method statement and set the inspection points before work starts.
QualifyWelding runs to WPS in our name, by welders qualified to TS EN ISO 9606-1.
Check incomingMaterial certificates, material lists and coating thickness are checked against the plan.
TestVisual and dimensional checks come first, then MT or UT; deck repairs wait 24 hours before NDT.
Request and recordInspection requests go to the consultant; fit-up, weld, NDT and torque results are recorded.

Standards

TS EN ISO 9606-1Welder qualification on the 1915 Çanakkale Bridge
AASHTO/AWS D1.5Bridge welding code on Bosphorus and Fatih Sultan Mehmet Bridge jobs
EN ISO 17638 / EN ISO 23278MT method and acceptance on Bosphorus jobs

Certificate numbers are available on request.

FAQ

Frequently asked questions

Who prepares the inspection and test plan?

We do. On the 1915 Çanakkale Bridge expansion joints and temporary works removal, and on the Çorlu steel building and towers, the ITP was prepared by Nunteknik. The Çorlu ITP set Execution Class EXC3 and EN 1090-2 Class 1 tolerances.

Do you hold your own welding procedures?

Yes. WPS and WPQR are in Nunteknik's name. On the 1915 Çanakkale Bridge we welded 35–50 mm S460M joints to our own WPS with processes 136 and 121; on the Bosphorus Bridge our WPS followed AASHTO/AWS D1.5 with 120 °C preheat.

Which NDT methods do you use?

Visual, magnetic particle and ultrasonic testing, with dye-penetrant testing to locate crack tips. On the Fatih Sultan Mehmet Bridge, dye-penetrant testing found 194 cracks beyond the contract list, and NDT came at least 24 hours after welding.

How does third-party inspection work on your sites?

We raise inspection requests to the consultant before NDT, bolt checks and painting. On two Bosphorus Bridge jobs, MT was carried out by a third-party inspection body to EN ISO 17638 and accepted every location examined.

Does subcontracted work go through the same checks?

Yes. Work by our partner shops and by the subcontractors we manage passes through our ITP and inspection chain. On the Çorlu project, the ITP control column covered both the partner shop and Nunteknik.