Completed social facility and trade centre, aerial view from the parking side — İkitelli, Istanbul
Projects
Commercial & InstitutionalDelivered 2025

İkitelli Social Facility and Trade Centre Completion Works

Nunteknik took over a social facility and trade centre with 19,814 m² of construction area in İkitelli, Istanbul at structural-frame stage, designed the strengthening of its roof steelwork and completed the finishes, MEP, lift and landscaping works under a single contract.

01 · The Brief

From shell to handover under one contract

Another contractor had built the reinforced concrete frame, the walls and the roof steelwork in the first phase. We took the building over without finishes, building services, site infrastructure or landscaping. We signed the contract directly with the client as the main contractor. Our scope covered finishing works, façade and roof cladding, mechanical and electrical services, the lift and landscaping, plus a small amount of concrete and reinforcement work.

02 · Technical Challenges

Inherited structure, revised design, water below foundations

The inherited roof steelwork needed strengthening. The retaining wall clashed with existing utilities, and the wet-area layouts conflicted with the structural drawings. The basement was the lowest level of the building, with a large volume of water below the foundations. Its walls had to be waterproofed from the inside.

03 · Our Execution

We designed the strengthening and ran the works

We revised the design with the client's supervision team and designed the roof strengthening using CHS and HEA sections. Our subcontractor fabricated and erected around 19 tonnes of strengthening steel. The new steel was blast-cleaned and painted, the existing roof steel received two coats of paint, and the roof was clad with 2,467 m² of sandwich panels. Our subcontractor applied 752 m² of negative-side waterproofing to the basement walls and injected polyurethane into the concrete cracks. Pumps ran for a cumulative 90 days to remove the water.

04 · The Outcome

Provisional acceptance, punch list closed

The acceptance committee inspected the building on 3 February 2025, and the provisional acceptance certificate, with its punch list, was approved on 10 February 2025. The completion certificate records the building as 100% complete on 24 February 2025, and a record dated 28 February 2025 confirms that the punch list was closed. Architectural, mechanical and electrical as-built drawings were prepared.

Capabilities Applied

What this project actually required

Not a generic service list — the specific capabilities exercised on this package.

Shop DrawingsStructural AnalysisSteel ErectionMulti-Trade CoordinationFabrication ManagementProtective Coating
Execution & Assurance

The stages we delivered on this project

Select a stage to see how it was carried out and controlled.

1
EngineeringApproved method
2
FabricationShop fabrication
3
HandoverAs-built dossier

Engineering

Engineering and method statements, approved before work starts.

Method statement approval

Project Documents — available on request

EN 1090EN ISO 9606
Project Gallery

From site works to the completed structure

Planning a comparable commercial or institutional building?

One contract. Steel to finish. Tell us the scope and we'll come back to you under single-point responsibility.