Hanger connections along the Fatih Sultan Mehmet Bridge deck — additional gusset plate welded to the existing hanger plate, Istanbul
Projects
BridgeDelivered 2022

Fatih Sultan Mehmet Bridge Gusset Plate Fabrication and Site Welding

On the Fatih Sultan Mehmet Bridge in Istanbul, Nunteknik managed the fabrication of additional gusset plates for the hanger replacement and welded them on site to the existing hanger plates with full-penetration welds, using a method developed over two mock-ups.

01 · The Brief

Additional gusset plates for the hanger replacement

The hangers of the Fatih Sultan Mehmet Bridge were being replaced, and additional gusset plates were to be added at the hanger connections. Detailed design stayed with the main contractor. As a subcontractor, we prepared the shop drawings, the method statement, the quality plan, and the inspection and test plan. We procured the steel and managed fabrication in a partner shop; shop and site painting were also in our scope. Our own crews then fitted and welded the plates to the existing hanger plates on the bridge.

02 · Technical Challenges

Thick-section welds on existing hanger plates, in situ

The gusset plates had to be welded in situ to the existing hanger plates along the south and north walkways. In thick-section full-penetration welding, distortion had to be kept under control. Site welding could not start until the method statement, weld map, programme, risk assessment, quality plan, inspection and test plan and welder certificates were complete.

03 · Our Execution

Mock-ups first, then site welding

The welding method was trialled on two mock-ups before site work. The first failed its magnetic particle test, and we revised the method. On the second, we also had an accredited laboratory run macro and hardness tests. On site, we clamped each plate with wedges and a fit-up jig we designed to the socket dimensions, tack-welded it and braced it with a strongback. We welded under a tent with preheat, starting with a root pass on ceramic backing and alternating between the two sides. An inspection firm carried out NDT 24 hours later.

04 · The Outcome

Traceability register and inspection records

The August 2022 site report records fit-up and welding as complete on the south and north walkways. A traceability register holds the heat number, welder and inspection report numbers for the plates. The project file contains fit-up, dimensional, visual, ultrasonic and magnetic particle records, and paint inspection reports dated October 2022.

Capabilities Applied

What this project actually required

Not a generic service list — the specific capabilities exercised on this package.

Method DevelopmentShop DrawingsQuality Plan & ITPWelding Procedure QualificationThird-Party InspectionNon-Destructive TestingFabrication ManagementProtective CoatingSteel ErectionWelded Connections
Execution & Assurance

The stages we delivered on this project

Select a stage to see how it was carried out and controlled.

1
EngineeringApproved method
2
FabricationShop fabrication
3
ErectionOwn crews first
4
TestingWeld inspection

Engineering

Engineering and method statements, approved before work starts.

Method statement approval

Project Documents — available on request

EN 1090EN ISO 9606NDT
Project Gallery

From the fabrication shop to the completed structure

Planning comparable bridge or infrastructure work?

Send us the drawings, the scope and the site constraints. We will set out how we would deliver the steelwork, from shop drawings to erection.