The Marmara Ereğlisi LNG Terminal jetty, pipe bridge and offshore platforms under construction
Projects
Industrial Facilities1992 – 1994

Marmara Ereğlisi LNG Terminal: Jetty and Plant Structural Steelwork

GMK fabricated and erected about 2,000 tonnes of steel for the jetty, berthing platforms, pipe bridge and plant roofs of the Marmara Ereğlisi LNG Terminal in Tekirdağ, Türkiye, in 1992–1994, fitting each 40-tonne platform to its pile section onshore.

01 · The Brief

Jetty and plant steelwork for an LNG terminal

The main contractor for the Marmara Ereğlisi LNG Terminal awarded GMK the steelwork for the jetty, where liquefied natural gas is unloaded from ships, and for the onshore plant. The scope of works covered pile driving, the berthing platforms at sea and the walkways between them, the steel supports of the pipe bridge and the steel roofs of the plant buildings. GMK prepared the shop drawings and the erection method statement. Process piping was outside its scope.

02 · Technical Challenges

Connections below the waterline, at sea

The berthing platforms were connected to their piles at elevation −2.50 m, below the water surface. The piles are steel, 2,200 mm in diameter, and each platform weighs 40 tonnes. The walkways linking the platforms are 50 m long each and had to reach the jetty over water before they could be lifted into place. Wave and weather conditions governed every step taken at sea.

03 · Our Execution

Platforms fitted onshore, set in place at sea

GMK cut the driven piles at elevation −2.50 m and took the upper sections ashore. It fabricated the berthing platforms on land and fitted them to these pile sections, which moved the platform-to-pile connection out of the water. Each pile-and-platform unit then went back into the sea and was rejoined to the lower pile at the cut elevation, below the waterline. Once all platforms were in place, GMK shipped the onshore-fabricated walkways out by barge and lifted them by crane into position between the platforms.

04 · The Outcome

About 2,000 tonnes of steel, from jetty to roofs

GMK fabricated and erected about 2,000 tonnes of steel in total, across the jetty, berthing platforms, walkways, pipe bridge and roofs. Joined by the walkways, the platforms form the jetty where LNG carriers berth and the gas is pumped ashore. The terminal was commissioned in 1994.

Capabilities Applied

What this project actually required

Not a generic service list — the specific capabilities exercised on this package.

Method DevelopmentShop DrawingsHeavy Crane LiftingSteel ErectionWelded ConnectionsBolted ConnectionsFabrication ManagementBarge Lifting
Execution & Assurance

Stages delivered on this project

Engineering
Fabrication
Erection
Project Gallery

From site works to the completed structure