1915 Çanakkale Bridge Temporary Working Platform Assembly Support

In 2019 Nunteknik supported the assembly, at a shipyard in Istanbul, of the temporary working platform (TWP) that would link the two towers of the 1915 Çanakkale Bridge, providing bolted-connection labour with a crew of around 20.

01 · The Brief

Labour support for the TWP assembly

The towers of the 1915 Çanakkale Bridge stand in the sea, and a temporary working platform (TWP) between them was needed for mobilisation. The platform was assembled at a shipyard in Istanbul, and the assembly was the shipyard's work. We provided labour support. Our crew worked on the bolted connections of the platform elements. Fabrication and welding were outside our scope.

02 · Technical Challenges

Night work inside the shipyard's assembly

According to the shift notice of early July 2019, the crew worked from 19:30 to 07:30. The shipyard ran the assembly, and its management was not ours. Our crew worked inside that assembly on a narrow scope of its own and followed the shipyard's site rules.

03 · Our Execution

A site supervisor and a crew of 18

The crew mobilised on 27 June 2019. The shift notice of early July lists our own site supervisor and 18 steelworkers. Over the whole job, 23 people in total were registered on our own payroll for this site.

04 · The Outcome

June to September 2019, timesheets on file

The assembly support ended in late September 2019. Timesheets and payroll records are on file for each month from June to September. We returned to the bridge for four further packages between 2020 and 2023. We delivered the access structures from shop drawings to erection, connected the expansion joints on site, erected the artillery shell figures and dismantled the temporary works.

Capabilities Applied

What this project actually required

Not a generic service list — the specific capabilities exercised on this package.

Bolted Connections

Planning comparable bridge or infrastructure work?

Send us the drawings, the scope and the site constraints. We will set out how we would deliver the steelwork, from shop drawings to erection.