Rumeli Hisarüstü–Aşiyan Funicular Line Steel Track Supports
For both stations of the Rumeli Hisarüstü–Aşiyan Funicular Line, Nunteknik had around 34 tonnes of steel track beams and supports fabricated to EXC3 under the system manufacturer's drawings, then delivered them galvanised and erected them with its own crews.
Steel track supports for two funicular stations
The top and bottom stations of the line needed steel track beams and supports to carry the funicular rails. The beams, supports, connection brackets and shim plates were to follow the funicular system manufacturer's drawing set. As a subcontractor, we were responsible for the supply of sections and plate, fabrication, hot-dip galvanising and delivery to site, along with high-strength bolt sets, anchors and 16 elastomeric bearings. Erection was added later under a second contract.
EXC3 requirements and sections sourced abroad
The drawings specified EN 1090 Execution Class EXC3 and welding to the manufacturer's welding standard, with 100% visual inspection of the welds. The longest track beam was 11.6 m long and weighed 2,158 kg. The track beams were HEB450 sections that had to be sourced from abroad. The parts lists also included shim plates 1, 2, 5 and 10 mm thick.
From parts lists to nesting, galvanising to site
We turned the manufacturer's parts lists into our own quantity and material lists and nested the plate parts by thickness. We sourced the HEB450 sections from abroad and managed fabrication at a partner shop. The galvanised parts went to site in batches, and our crews erected the beams and supports at both stations. On a later additional request, we had a further 234 shim plates, 5 mm thick, fabricated and delivered.
Around 34 tonnes of track supports, two stations
The track beams and supports for the top and bottom stations were delivered galvanised and erected. According to the parts lists, the fabricated steel came to around 34 tonnes. The galvanising measurement report records coating thickness above the EN ISO 1461 requirement at every point measured in a 3.9-tonne batch.
What this project actually required
Not a generic service list — the specific capabilities exercised on this package.
The stages we delivered on this project
Select a stage to see how it was carried out and controlled.
Fabrication
Steel fabricated in EN 1090 certified partner shops under our quality control, to approved welding procedures (WPS).
Erection
Steel erected by our own crews and, where the work calls for it, by subcontractors we manage.
From the fabrication shop to the completed structure