Muhammed Kahya

Civil Engineer · Deputy General Manager

Deputy General Manager at Nunteknik. Runs the company's operations on bridge, industrial and commercial steel contracts.

Member, Chamber of Civil Engineers of Türkiye (İMO)Occupational health and safety specialist, Class C
Nunteknik team · AboutLanguagesTurkish · English
In short
Graduated in civil engineering from Sakarya University in 2010. At Nunteknik he has served as site manager, head of technical office and project manager on works at the Bosphorus, Fatih Sultan Mehmet and 1915 Çanakkale bridges. As Deputy General Manager, he now runs the company's operations.
Track record

Delivered work

16
Years on site

Figures and project names are published only after confirmation against the project record.

Projects worked on
Bosphorus Bridge Tower Strengthening and Damper InstallationFatih Sultan Mehmet Bridge Orthotropic Deck Crack RepairBosphorus Bridge Expansion Joint ReplacementRumeli Hisarüstü Funicular Station Steel Strut Shoring72-Classroom School Campus in Sancaktepe, IstanbulBosphorus Bridge Tower-Deck Junction Repair1915 Çanakkale Bridge Anchor Block and Pier Access StructuresBosphorus Bridge Orthotropic Deck Crack Repair1915 Çanakkale Bridge Expansion Joint InstallationRumeli Hisarüstü–Aşiyan Funicular Line Steel Track SupportsFatih Sultan Mehmet Bridge Gusset Plate Fabrication and Site Welding1915 Çanakkale Bridge Tower and Anchorage Temporary Works Removal1915 Çanakkale Bridge Tower Top Enclosure ErectionVertical Bright Annealing Line (VBAL) Building and Towers, ÇorluFatih Sultan Mehmet Bridge Maintenance Gantry Replacement

Achievements

  • Bosphorus Bridge: 412 tonnes of stiffeners and diaphragms erected inside the four tower legs, up to +149.25 m (site manager)
  • Fatih Sultan Mehmet Bridge: 1,576 fatigue cracks repaired in the orthotropic deck under live traffic (head of technical office)
  • Sancaktepe: 72-classroom, 19,005 m² school campus delivered turnkey, provisional acceptance eight months after site start (head of technical office)
  • Bosphorus Bridge: 59 fatigue cracks repaired in the orthotropic deck (58 in the contract), in 33 days against a 60-day contract period (project manager)
  • 1915 Çanakkale Bridge: around 1,400 tonnes of temporary steelwork dismantled from the towers and anchor blocks (deputy general manager)
  • 1915 Çanakkale Bridge: four 55-tonne modular expansion joints installed (deputy general manager)
  • Çorlu: around 1,093 tonnes of steel for building strengthening and machine towers at an operating plant (deputy general manager)
Bridge & Infrastructure

What a Method Statement Reviewer Asks — and How to Answer First

A method statement is rarely sent back for what it says; it is sent back for what it leaves out. Review forms from two bridge jobs show the same gaps: lifting points not checked on site, a sequence not tied to access, no fallback for a seized bolt, and no landing place for each piece.

1915 Çanakkale Bridge Tower and Anchorage Temporary Works Removal
Read →
Bridge & Infrastructure

Dismantling Structural Steel Is Not Erection in Reverse

Dismantling is not erection in reverse. Every piece removed leaves the structure in a state it was not designed for, so the sequence is planned separately and written down first. The crane sizes the pieces, seized connections are cut, the structure around the works often stays in use, and reused steel comes out only when the next area is ready.

1915 Çanakkale Bridge Tower and Anchorage Temporary Works Removal
Read →
Commercial & Institutional

One Contract on a Steel-Heavy Build: What It Covers and What It Does Not

One contract puts the steel frame, the civil works under it and the envelope with one contractor, so a clash between trades is found before the next trade starts. It is not design-build: the client's engineers usually design, and we build from their drawings. Process equipment and the production line are not ours to supply or design.

İkitelli Business Centre Shell and Core Works
Read →