Fatih Sultan Mehmet Bridge
Opened in 1988, the Fatih Sultan Mehmet Bridge is the second suspension bridge across the Bosphorus, with a 1,090 m main span. We repaired fatigue cracks in its orthotropic deck, and fabricated and site-welded its gusset plates.
The work in brief
Nunteknik carried out two separate packages on the Fatih Sultan Mehmet Bridge in Istanbul, both as a subcontractor. One was inside the deck, the other at the hanger connections.
In the orthotropic steel box girder deck we repaired 1,576 fatigue cracks of 21 types, working from inside the deck with the bridge open to traffic. The contract listed 1,386 cracks, revised by addendum to 1,382, and dye-penetrant testing then found 194 more. Where a repair type cut an opening in a rib, we cut each opening and installed its strengthening plate within a single overnight closure of the lane above.
During the hanger replacement we managed the fabrication of the additional gusset plates in a partner shop and welded them on site to the existing hanger plates along the south and north walkways with full-penetration welds. The welding method was trialled on two mock-ups before site work. The first failed its magnetic particle test, and we revised the method. Detailed design stayed with the main contractor.
The provisional acceptance certificate for the crack repair was signed in November 2017. The August 2022 site report records fit-up and welding of the gusset plates as complete.
Where on the bridge we worked
Each number marks one job. Point at a number or a row to see every place it was done.
Swipe sideways → · Lengths to scale, heights exaggerated 2.5×; schematic, not for taking dimensions. Sources: public project drawings; Wikipedia; Structurae.
- Orthotropic Deck Crack Repair
- Gusset Plate Fabrication and Site Welding
What we did on the Fatih Sultan Mehmet Bridge

Fatih Sultan Mehmet Bridge Orthotropic Deck Crack Repair
Working from inside the deck while traffic kept crossing above, Nunteknik repaired 1,576 fatigue cracks of 21 types in the orthotropic steel deck of the Fatih Sultan Mehmet Bridge in Istanbul, and the work passed provisional acceptance.
View project →
Fatih Sultan Mehmet Bridge Gusset Plate Fabrication and Site Welding
On the Fatih Sultan Mehmet Bridge in Istanbul, Nunteknik managed the fabrication of additional gusset plates for the hanger replacement and welded them on site to the existing hanger plates with full-penetration welds, using a method developed over two mock-ups.
View project →
Fatih Sultan Mehmet Bridge Maintenance Gantry Replacement
Nunteknik removed the travelling maintenance gantry under the main span of the Fatih Sultan Mehmet Bridge and is managing fabrication of its replacement, a four-motor gantry with a 39.86 m clear span.
View project →From our work on the bridge