Galata Bridge
Spanning the Golden Horn between Karaköy and Eminönü, the Galata Bridge opened in 1994 with an opening bascule section at its centre. Nessac (former trading name) repaired its bascule leaves.
The work in brief
Nessac (former trading name) repaired the bascule leaves of the Galata Bridge in Istanbul between 1999 and 2001, working as a subcontractor.
The bridge opens at its bascule span, where four steel leaves give ships entering the Golden Horn an 80 m clear opening. In 1998 cracks were found in the cross girders and hanger plates that carry the leaves' counterweights. Each counterweight was around 1,000 tonnes of barite concrete, and no strengthening or welding could start until that load came off the cracked members.
Nessac fabricated temporary transfer girders and a temporary steel support and scaffolding system inside the caisson, rising from the −7.50 m elevation to the underside of the counterweight. Hydraulic jacks moved the counterweight load through the temporary girders onto the leaves' main girders. With the zone unloaded, the strengthening plates, in places 100 mm thick, were fitted, welded to the approved welding procedure specification and inspected by non-destructive testing. All four leaves were worked in parallel.
Nessac then put the load back through the repaired cross girders and hanger plates, took down the temporary system and serviced the bascule's hydraulic, electrical-electronic and mechanical systems. The bascule went back into service in 2001.
Where on the bridge we worked
Each number marks one job. Point at a number or a row to see every place it was done.
Swipe sideways → · Lengths to scale, heights exaggerated 2.5×; schematic, not for taking dimensions. Sources: Wikipedia; Structurae.
- Bascule Leaf Repair
What we did on the Galata Bridge
From our work on the bridge
01Bascule Leaf Repair
More bridge references
Planning comparable bridge work?
Send us the drawings, the scope and the site constraints. We will set out how we would deliver the steelwork, from shop drawings to erection.