For European Companies Building in Türkiye

Your Plant in Türkiye, Built to European Standards

We deliver steel buildings and structural steelwork in Türkiye to the European standards in your specification, under a single contract. We work in English, and our project team includes engineers who speak German and Italian.

Short answer
Nunteknik is a steel-led general contractor in Türkiye. We work to the European standards named in the client's specification: fabrication to EN 1090-2 in certified partner shops under our responsibility, access structures to EN ISO 14122. Our work has passed the quality audits of European companies including Maurer and Doppelmayr & Garaventa. We have not yet published a project for a European plant owner; the industrial record below is for a Korean manufacturer in Tekirdağ.
Evidence

Audited by European Companies

Maurer (Germany) and Doppelmayr & Garaventa (Austria), on bridge and funicular work in Türkiye.

Certification

EN 1090-2 · EXC2 (partner shops)EN 1090-2 · EXC3 (partner shops)
What this means for your project

How We Work With You

European standards on site

EN 1090-2 fabrication, EN ISO 14122 access geometry, method statements and the inspection and test plan (ITP) before work starts.

One contract

Single-point responsibility for the structural steelwork and, where you want it, the building around it.

Languages

We work with you in English. Our project team includes engineers who speak German and Italian.

Records you can audit

Traceability registers, fit-up and non-destructive testing (NDT) reports, as-built drawings and O&M manuals handed over at the end.

Send Us the Specification

We will tell you which clauses we deliver ourselves and which through partner shops and subcontractors we manage.

Before you commit

Questions a European Buyer Asks First

Our answers, including the one where we have no record yet.

  • Have you built for a European investor?

    Not yet on our published record. We have worked to European standards and passed European companies' audits on bridge and funicular work.

    See reference projects
  • Do you have your own fabrication shop?

    No. Fabrication runs in EN 1090 certified partner shops under our responsibility. We prepare the shop drawings and the inspection and test plan, and the shop works to them.

    See certification
  • Can we see your quality documents?

    Yes, with the proposal: sample ITP, partner shop certificates and redacted acceptance records.

    Request a quote
Will the price move during the project?
Variations to the scope of works are priced only after your written approval. At the İkitelli business centre in Istanbul, the client added four packages to the same contract while work was under way.
Which execution class do you work to?
To the class in your specification. The steel building and machine towers in Çorlu, Tekirdağ (2025) and the funicular track supports in Istanbul (2021) were built to EXC3 under EN 1090-2.
Can you take the whole building, not only the steel?
Yes. At the İkitelli business centre in Istanbul we were main contractor from excavation to façade; fit-out and MEP stayed outside our scope.
Can you work while our plant stays in production?
Yes. In Çorlu, Tekirdağ, we agreed the sequence with the plant's production and maintenance teams and opened the roof in 150 × 150 cm sections, closed at the end of every shift.
Do you provide lift plans and method statements?
Yes. We write the method statement and the lift plans before erection and submit them for approval.
Request type · sets the form depth
Quote → adds sector, scope and timing fields.
Routes the request to the right team.
Project scope
At least 10 characters.

Your request is used only for technical evaluation and is not shared with third parties.