Across Bridge & Infrastructure and Commercial & Institutional
What a Method Statement Reviewer Asks — and How to Answer First
A method statement is rarely sent back for what it says; it is sent back for what it leaves out. Review forms from two bridge jobs show the same gaps: lifting points not checked on site, a sequence not tied to access, no fallback for a seized bolt, and no landing place for each piece.
Dismantling Structural Steel Is Not Erection in Reverse
Dismantling is not erection in reverse. Every piece removed leaves the structure in a state it was not designed for, so the sequence is planned separately and written down first. The crane sizes the pieces, seized connections are cut, the structure around the works often stays in use, and reused steel comes out only when the next area is ready.
One Contract on a Steel-Heavy Build: What It Covers and What It Does Not
One contract puts the steel frame, the civil works under it and the envelope with one contractor, so a clash between trades is found before the next trade starts. It is not design-build: the client's engineers usually design, and we build from their drawings. Process equipment and the production line are not ours to supply or design.